Project performance indicators of engineering design groups: Evaluation and proposed improvement
Author :
Hartono, B. ; Muhamad, I.
Author_Institution :
Ind. Eng. Program, Univ. Gadjah Mada, Yogyakarta, Indonesia
fYear :
2014
fDate :
23-25 Sept. 2014
Firstpage :
140
Lastpage :
144
Abstract :
The study aims at investigating the current approach in utilizing project performance indicators for engineering groups within the context of engineering, procurement, and construction (EPC) project. A systems dynamics methodology is utilized and an EPC project of developing a geothermal power plant is observed. The result confirms a common wisdom that the underlying assumption utilized by current assessment methods does not reflect an accurate assessment of group or departmental performance. This is due to systemic errors beyond the scope of the particular department. A proposed model is developed to assist the adjustment of project schedule baseline. It considers systemic effects hence provide a more accurate performance evaluation model.
Keywords :
geothermal power stations; procurement; project management; EPC project; departmental performance assessment; engineering design groups; engineering-procurement-and-construction project; geothermal power plant development; group performance assessment; performance evaluation model; project performance indicators; project schedule baseline; system dynamics methodology; systemic errors; Adaptation models; Data models; Power generation; Procurement; Project management; Schedules; Testing; EPC; projects; schedule performance indicators; systems dynamics;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management of Innovation and Technology (ICMIT), 2014 IEEE International Conference on
Conference_Location :
Singapore
Type :
conf
DOI :
10.1109/ICMIT.2014.6942415
Filename :
6942415
Link To Document :
بازگشت