DocumentCode :
1376265
Title :
Field tests on a 100-megawatt rectifier installation
Author :
Dillard, J. K. ; Kiefer, John ; Hague, C. S.
Author_Institution :
Westinghouse Electric Corporation, East Pittsburgh, Pa.
Volume :
74
Issue :
2
fYear :
1955
fDate :
5/1/1955 12:00:00 AM
Firstpage :
245
Lastpage :
253
Abstract :
IN THIS paper results are presented from field tests made in March 1954 on the 100-megawatt ignitron rectifier station at the Robert P. Patterson plant, Arkadelphia, Ark., of the Reynolds Metals Company. Power from the rectifier station is used in the electrolytic reduction of aluminum, and all of the power is consumed on one aluminum potline. This is the largest concentration of d-c power on a single potline in this country.
Keywords :
Anodes; Assembly; Cathodes; Circuit breakers; Delay; Rectifiers; Switches;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Part I: Communication and Electronics, Transactions of the
Publisher :
ieee
ISSN :
0097-2452
Type :
jour
DOI :
10.1109/TCE.1955.6372280
Filename :
6372280
Link To Document :
بازگشت