Abstract :
A PAPER presented by Sporn and Marquis1 in 1954 outlines quite specifically practically all phases of the economic, engineering, and financing problems in connection with the supply of 1,800,000 kw of power to the Atomic Energy Commission Portsmouth Area. The measurement of the electrical quantities of this load, to satisfy the contractual requirements, created a number of additional problems, not usually encountered in the measurement of power and energy.