• DocumentCode
    1378373
  • Title

    Budget constrained planning to optimize power system reliability

  • Author

    Brown, Richard E. ; Marshall, Michael

  • Author_Institution
    ABB Power T&D Co. Inc., Raleigh, NC, USA
  • Volume
    15
  • Issue
    2
  • fYear
    2000
  • fDate
    5/1/2000 12:00:00 AM
  • Firstpage
    887
  • Lastpage
    892
  • Abstract
    De-regulation and re-regulation are forcing electric utilities to become more cost conscious. At some utilities, this has manifested itself in drastically reduced capital budgets. At the same time, utilities are under great pressure to maintain (and even improve) system reliability. With reduced budgets, it becomes necessary to establish accept/reject criteria that best allocates the budget while obtaining the highest possible system reliability. This paper presents a Budget Constrained Planning method to handle this situation. This method formulates project approvals as a rigorous optimization problem and uses a marginal cost/benefit approach similar to economic dispatch. Budget Constrained Planning is applied to the 1999 discretionary projects fund at Ameren Corporation and results are discussed
  • Keywords
    cost-benefit analysis; power system economics; power system planning; power system reliability; Ameren Corporation; Budget Constrained Planning method; accept/reject criteria; budget constrained planning; marginal cost/benefit approach; power system reliability optimisation; rigorous optimization problem; Constraint optimization; Costs; Environmental economics; Maintenance engineering; Power generation economics; Power industry; Power system planning; Power system reliability; Process planning; Reliability engineering;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.867189
  • Filename
    867189