DocumentCode :
1378373
Title :
Budget constrained planning to optimize power system reliability
Author :
Brown, Richard E. ; Marshall, Michael
Author_Institution :
ABB Power T&D Co. Inc., Raleigh, NC, USA
Volume :
15
Issue :
2
fYear :
2000
fDate :
5/1/2000 12:00:00 AM
Firstpage :
887
Lastpage :
892
Abstract :
De-regulation and re-regulation are forcing electric utilities to become more cost conscious. At some utilities, this has manifested itself in drastically reduced capital budgets. At the same time, utilities are under great pressure to maintain (and even improve) system reliability. With reduced budgets, it becomes necessary to establish accept/reject criteria that best allocates the budget while obtaining the highest possible system reliability. This paper presents a Budget Constrained Planning method to handle this situation. This method formulates project approvals as a rigorous optimization problem and uses a marginal cost/benefit approach similar to economic dispatch. Budget Constrained Planning is applied to the 1999 discretionary projects fund at Ameren Corporation and results are discussed
Keywords :
cost-benefit analysis; power system economics; power system planning; power system reliability; Ameren Corporation; Budget Constrained Planning method; accept/reject criteria; budget constrained planning; marginal cost/benefit approach; power system reliability optimisation; rigorous optimization problem; Constraint optimization; Costs; Environmental economics; Maintenance engineering; Power generation economics; Power industry; Power system planning; Power system reliability; Process planning; Reliability engineering;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.867189
Filename :
867189
Link To Document :
بازگشت