• DocumentCode
    1394740
  • Title

    Computing the cost of unbundled services [power transmission]

  • Author

    Willis, Lee ; Finney, John ; Ramon, Greg

  • Author_Institution
    T&D Technol., ABB Syst. Control, Cary, NC, USA
  • Volume
    9
  • Issue
    4
  • fYear
    1996
  • fDate
    10/1/1996 12:00:00 AM
  • Firstpage
    16
  • Lastpage
    21
  • Abstract
    A central tenet of electric power industry deregulation is that the delivery of electric power (a service) must be decoupled from the purchase of the power itself (a product) and priced and contracted separately. Transmission of electricity must be offered and priced separately from the power itself, and delivery of power must stand on its own as a business. Regardless of the precise nature of the deregulated system´s rules and structure, this means that transmission system operators need to know the actual operating costs of providing transmission services to their customers. Here, the authors argue that such analysis of costs and cost flow will become as routine and sophisticated as the analysis of electrical performance is at the present
  • Keywords
    costing; economics; electricity supply industry; tariffs; transmission network calculations; cost flow analysis; costs analysis; deregulation; electric power industry; operating costs; power transmission; price; transmission services; transmission system; unbundled services; Application software; Centralized control; Computational efficiency; Control systems; Cost function; Displays; Performance analysis; Power engineering computing; Power system analysis computing; Research and development;
  • fLanguage
    English
  • Journal_Title
    Computer Applications in Power, IEEE
  • Publisher
    ieee
  • ISSN
    0895-0156
  • Type

    jour

  • DOI
    10.1109/67.539841
  • Filename
    539841