  • Abstract
    This paper describes how, in mid February of 1998, the Auckland central business district (New Zealand) suffered a power failure that left it with a minimal supply of power for three weeks and shortages and restrictions for another month or more. By the beginning of April, power supplies were sufficient-but still at risk from a single failure. It will be several months before the supply is reasonably secure and at least 18 months before a new tunnel carrying two 230 MVA 110 kV power cables is in service.
  • Keywords
    power system reliability; 110 kV; 230 MVA; Auckland central business district; New Zealand; power cables; power failure; power network reliability; power restrictions; power shortages; power supplies; project construction;
  • fLanguage
    English
  • Journal_Title
    Power Engineering Journal
  • Publisher
    iet
  • ISSN
    0950-3366
  • Type

    jour

  • DOI
    10.1049/pe:19980303
  • Filename
    693771