Title :
Catenary construction for the Cleveland terminal
Author :
Clement, N. F. ; Richards, E. E.
Author_Institution :
The Cleveland Union Term. Co.
Abstract :
Design and construction details involved in the electrification of 59 track miles in connection with a major union terminal development are outlined.
Keywords :
Assembly; Bridges; Communication cables; Contacts; Copper; Insulation life; Wires;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1931.6429422