DocumentCode :
1408294
Title :
Advanced Loop Scheme: Improving Reliability Through Better Operational Methods
Author :
Wernsing, Richard ; Hubertus, James ; Duffy, Mike ; Hataway, Greg ; Conner, Derek ; Nelson, Elijah
Author_Institution :
Public Service Electr. & Gas Co. in Newark, Newark, NJ, USA
Volume :
18
Issue :
2
fYear :
2012
Firstpage :
14
Lastpage :
22
Abstract :
With the ever-increasing importance of electricity, excellent service reliability is no longer a luxury in the eyes of consumers but an expectation. In response to this expectation, Public Service Electric and Gas Company (PSE&G) is making a significant investment in a new technology to help improve reliability. This technology uses an automated feeder reconfiguration scheme that not only minimizes the duration of an outage due to a fault and the number of customers impacted by it but also reduces the number of customers experiencing a blink and subsequent switching. This article examines the design and implementation of the ALS. It gives the specific settings and operational details for the scheme.
Keywords :
power distribution faults; power distribution reliability; Public Service Electric and Gas Company; advanced loop scheme; automated feeder reconfiguration; blink switching; operational methods; power system reliability; service reliability is; subsequent switching; Circuit faults; Electricity supply industry; Optical fiber cables; Optical fiber devices; Optical fiber networks; Reliability engineering;
fLanguage :
English
Journal_Title :
Industry Applications Magazine, IEEE
Publisher :
ieee
ISSN :
1077-2618
Type :
jour
DOI :
10.1109/MIAS.2011.2175549
Filename :
6112292
Link To Document :
بازگشت