DocumentCode :
1408880
Title :
Electrical operation on the Great Northern
Author :
Cox, J. B.
Author_Institution :
General Elec. Co., Erie, Pa.
Volume :
51
Issue :
9
fYear :
1932
Firstpage :
627
Lastpage :
633
Abstract :
To eliminate a circuitous mountain crossing which had become the “bottle neck” of the line, the Great Northern Railway built a tunnel almost 8 miles long, relocated 17 miles of track, and electrified 73 miles of line. Some of the operating experiences and savings effected in the 3 years since electrical operation was begun are outlined in this article
Keywords :
Cathodes; Current transformers; Engines; Portals; Rail transportation; Roads; Welding;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1932.6429976
Filename :
6429976
Link To Document :
بازگشت