• DocumentCode
    1408880
  • Title

    Electrical operation on the Great Northern

  • Author

    Cox, J. B.

  • Author_Institution
    General Elec. Co., Erie, Pa.
  • Volume
    51
  • Issue
    9
  • fYear
    1932
  • Firstpage
    627
  • Lastpage
    633
  • Abstract
    To eliminate a circuitous mountain crossing which had become the “bottle neck” of the line, the Great Northern Railway built a tunnel almost 8 miles long, relocated 17 miles of track, and electrified 73 miles of line. Some of the operating experiences and savings effected in the 3 years since electrical operation was begun are outlined in this article
  • Keywords
    Cathodes; Current transformers; Engines; Portals; Rail transportation; Roads; Welding;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1932.6429976
  • Filename
    6429976