DocumentCode
1408880
Title
Electrical operation on the Great Northern
Author
Cox, J. B.
Author_Institution
General Elec. Co., Erie, Pa.
Volume
51
Issue
9
fYear
1932
Firstpage
627
Lastpage
633
Abstract
To eliminate a circuitous mountain crossing which had become the “bottle neck” of the line, the Great Northern Railway built a tunnel almost 8 miles long, relocated 17 miles of track, and electrified 73 miles of line. Some of the operating experiences and savings effected in the 3 years since electrical operation was begun are outlined in this article
Keywords
Cathodes; Current transformers; Engines; Portals; Rail transportation; Roads; Welding;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1932.6429976
Filename
6429976
Link To Document