Title :
Governor performance during system disturbances
Author :
Buell, R. C. ; Caughey, R. J. ; Hunter, E. M. ; Marquis, V. M.
Author_Institution :
General Electric Company Schenectady
Abstract :
Tests show conclusively that steam-electric generators may lose synchronism and pull backinto step without giving any conclusive evidence of that fact either at the generator or in the control room.
Keywords :
Circuit faults; Circuit stability; Companies; Generators; Oscillators; Turbines; Valves;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1931.6430149