• DocumentCode
    1411742
  • Title

    Power limits of 220-kv transmission lines

  • Author

    Kroneberg, Alex A. ; Macferran, Mabel

  • Author_Institution
    Southern Calif. Edison Co., Ltd., Los Angeles
  • Volume
    52
  • Issue
    11
  • fYear
    1933
  • Firstpage
    758
  • Lastpage
    766
  • Abstract
    For the transmission of power from Boulder Dam to the system of the Southern California Edison Company, numerous studies were made to determine the power limits of various designs of transmission lines, and the maximum generating capacity that could be installed safely at Boulder Dam without incurring instability. These studies were made for various design features and types of load and faults. The results of the studies are presented in this paper, a description of the method used being included in the appendixes.
  • Keywords
    Circuit faults; Circuit stability; Coils; Generators; Resistance; Switches; Transient analysis;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1933.6430481
  • Filename
    6430481