Title :
Improvements at Burlington generating station
Author :
Cisler, W. L. ; Gavit, W. P.
Author_Institution :
Public Service Electric and Gas Company, Newark, N. J.
fDate :
6/1/1933 12:00:00 AM
Abstract :
THE RECENT development at Burlington generating station of the Public Service Electric and Gas Company of New Jersey is of special interest in these days of stringent economies and efforts to make existing equipment go as far as possible. The station contained 3 12,500-kw turbine-generators from 10 to 16 years old with a stoker fired boiler plant all operating at 200 lb steam pressure with 150 deg superheat; the fuel consumption was 22,000 to 25,000 Btu per kwhr which is about what would be expected with these steam conditions and equipment of that period.
Keywords :
Cable insulation; Cable shielding; Companies; Conductors; Rectifiers; Torque; Welding;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1933.6430781