DocumentCode
1413759
Title
Burlington generating station improvements
Author
Cisler, W. L. ; Gavit, W. P.
Author_Institution
Pub. Serv. Elec and Gas. Co., Newark, N. J.
Volume
52
Issue
7
fYear
1933
fDate
7/1/1933 12:00:00 AM
Firstpage
481
Lastpage
486
Abstract
The installation of a new boiler and high-back-pressure non-condensing turbine which exhausts into 3 older turbines, reduced the fuel consumption at the Burlington station from 22,000–25,000 Btu per kwhr to about 15,000 Btu per kwhr. Electrical and mechanical details in the improvement of the station are described in this article.
Keywords
Boilers; Fuels; Induction motors; Steel; Turbines; Welding;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1933.6430823
Filename
6430823
Link To Document