• DocumentCode
    1414806
  • Title

    Control room in an experimental load-dispatching system for the power-supply industry

  • Author

    Brewer, C. ; Frost, Jennifer ; Parish, C.C.M.

  • Author_Institution
    CEGB, Central Electricity Research Laboratories, Leatherhead, UK
  • Volume
    115
  • Issue
    2
  • fYear
    1968
  • fDate
    2/1/1968 12:00:00 AM
  • Firstpage
    318
  • Lastpage
    324
  • Abstract
    The paper describes the extra facilities provided in a control room for an experimental automatic load-dispatching system, installed for evaluation trials by the CEGB in south-west England. These facilities permitted limited operational experience to be obtained and demonstrated the feasibility of this application of automatic control. The important differences in the control room, compared with a conventional design, are the elimination of the wall diagrams and the ready access to all system data via a specially designed keyboard and alpha-numeric c.r.t. displays. The control engineers´ chief difficulties have been in ensuring that realistic constraints and accurate data are used in the computer´s calculations. These difficulties will place greater emphasis on displays, the display-selection system and the methods of data collection and alarm analysis in the future.
  • Keywords
    automatic control applications; electrical power systems; load (electric); power systems;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineers, Proceedings of the Institution of
  • Publisher
    iet
  • ISSN
    0020-3270
  • Type

    jour

  • DOI
    10.1049/piee.1968.0056
  • Filename
    5248179