DocumentCode
1415274
Title
Extension of the Pennsylvania railroad´s electrified system
Author
Griffith, H. C.
Author_Institution
Lehigh University in 1914
Volume
57
Issue
1
fYear
1938
Firstpage
10
Lastpage
15
Abstract
THE EXISTING single-phase electrified system of The Pennsylvania Railroad, completed in the early part of 1935, extends from New York, N. Y., through Philadelphia, Pa., to Wilmington, Del., Baltimore, Md., Washington, D. C., and Potomac Yard, Va., for passenger and freight service north and south; and from New York to Philadelphia and Paoli, Pa, for service east and west. Including the trackage used for suburban service, this electrified system now covers a route of 373 miles with 1,343 miles of electrified track.
Keywords
Circuit breakers; Circuit faults; Power transformer insulation; Substations; Supervisory control; Switches; Wires;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1938.6431086
Filename
6431086
Link To Document