DocumentCode :
141647
Title :
Multi-level skill-based allocation methodology for evolvable assembly systems
Author :
Cavin, Shirley ; Lohse, Niels
Author_Institution :
Manuf. Eng., Loughborough Univ., Loughborough, UK
fYear :
2014
fDate :
27-30 July 2014
Firstpage :
532
Lastpage :
537
Abstract :
Manufacturing systems are under constant pressure to deliver in an agile way high-quality products, hence, assembly systems are required to be flexible, adaptable and reconfigurable to cater for these trends. This has led to the rise of new paradigms, where concepts such as, “plug and produce”, modularity and agent technology are applied. Among them highlights Evolvable Assembly Systems (EAS) which proposes an agile solution by considering a “plug and produce” environment. This approach presents a number of opportunities and challenges. One of these is the allocation of assembly capabilities to process requirements. This arises due to the separation of product driven requirements from the implementation process, into capabilities that embed the concepts of modularity and “plug and produce”. Users tend to define assembly process requirements at a high level, with the objective to be equipment independent, while equipment specific processes are normally defined at the lowest-level of granularity to be applied in different assembly workflows. The more specific a user defines production requirements the more limited is the number of solutions that can be offered by a particular assembly system, hence, the tendency to define production requirements at high level. This presents an important problem, the need to bridge the gap between assembly process requirements definition with the lower-level capabilities provided by equipment in a particular assembly system. This scenario is the motivation of this work, and the definition of a methodology that takes into consideration different levels of process requirements definitions, and the allocation of lower level skills (capabilities) which are equipment specific using skill-based patterns to provide feasible assembly processes solutions.
Keywords :
agile manufacturing; assembling; product quality; production engineering computing; EAS; agent technology; agile solution; assembly capabilities; assembly process requirements; assembly processes solutions; assembly workflows; evolvable assembly systems; high-quality products; manufacturing systems; multilevel skill-based allocation methodology; plug and produce environment; product driven requirements; production requirements; skill-based patterns; Assembly; Assembly systems; Complexity theory; Mechatronics; Pattern matching; Plugs; Resource management; Assembly; Configuration; Evolvable; Industrial Agent; Matching; Mechatronic; Pattern; Plug & Produce; Skill;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Informatics (INDIN), 2014 12th IEEE International Conference on
Conference_Location :
Porto Alegre
Type :
conf
DOI :
10.1109/INDIN.2014.6945569
Filename :
6945569
Link To Document :
بازگشت