DocumentCode
1419694
Title
Symposium on operation of the Boulder Dam transmission line — Carrier-current equipment
Author
Laughlin, J. D.
Author_Institution
City of Los Angeles, Calif.
Volume
58
Issue
4
fYear
1939
fDate
4/1/1939 12:00:00 AM
Firstpage
147
Lastpage
151
Abstract
CARRIER-CURRENT equipment is being employed for three distinct services on the Boulder Dam transmission line: first, for pilot channels for automatic protective line relays; second, for a transmission channel for supervisory control equipment which provides control from Boulder power plant of the two switching stations between Boulder and Los Angeles; and third, for telephone communication between Los Angeles, Boulder, and the two intermediate stations, and to transmit orders to line patrolmen who may be working at any point along the line. These three functions may be performed simultaneously without interference with each other, and are not affected by power conditions or normal switching conditions on the line.
Keywords
Couplings; Power transmission lines; Receivers; Relays; Supervisory control; Switches; Switching circuits;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1939.6431869
Filename
6431869
Link To Document