Title :
Symposium on operation of the Boulder Dam transmission line — Transmission line relay protection
Author_Institution :
City of Los Angeles, Calif.
fDate :
4/1/1939 12:00:00 AM
Abstract :
WHEN the study of these lines for the application of protective relays was started the predetermination of fault currents made it necessary to calculate all of the phase-sequence constants of the lines since none of these constants for conductors of this size and spacing was available.
Keywords :
Circuit faults; Coils; Receivers; Rectifiers; Relays; Shafts; Transmitters;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1939.6431870