• DocumentCode
    1420331
  • Title

    The Colorado — Big Thompson project

  • Volume
    60
  • Issue
    2
  • fYear
    1941
  • Firstpage
    85
  • Lastpage
    85
  • Abstract
    Culminating 50 years of effort on the part of the people of Colorado to secure additional irrigation water for northeastern Colorado, the Colorado Big Thompson project entered the construction stage in December 1938. A Bureau of Reclamation project, the general plan of the complete development from the standpoint of future operation, will extend from the vicinity of Kremmling on the western slope of the Continental Divide to Julesburg and the state line on the eastern slope.
  • Keywords
    Books; Companies; Distance measurement; Electrical engineering; Irrigation; Power generation; Reservoirs;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1941.6431985
  • Filename
    6431985