A study of BESS application for the diferral of power distribution system investment
Author :
Wannasut, Chanikkanan ; Hongesombut, Komsan
Author_Institution :
Dept. of Electr. Eng., Kasetsart Univ., Bangkok, Thailand
Volume :
3
fYear :
2014
fDate :
26-28 April 2014
Firstpage :
1624
Lastpage :
1628
Abstract :
This paper focuses on the study of the application of the battery energy storage system (BESS) installation instead of the distribution line reinforcement for a short-term planning. The economical tool such as Net Present Value (NPV) will be employed for cost comparison of both alternatives. The 22kV distribution network of the Provincial Electric Authority, Thailand was used as a case study. From the study, it reveals that the problems of overloaded line occurring in the short-time period per day (<;6hr) can be reduced by the BESS installation. It is also shown that this approach is applied to postpone the system reinforcement in a short-term planning (3 years) but not applicable for the long-term planning (over 5 years).
Keywords :
battery storage plants; investment; power distribution economics; power distribution planning; BESS application; NPV; Provincial Electric Authority; Thailand; battery energy storage system installation; net present value; power distribution system investment; short-term planning; Batteries; Economics; Electrical engineering; Investment; Load flow; Power generation; battery energy storage system; net present value; renewable energy resource;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Science, Electronics and Electrical Engineering (ISEEE), 2014 International Conference on
Conference_Location :
Sapporo
Print_ISBN :
978-1-4799-3196-5
Type :
conf
DOI :
10.1109/InfoSEEE.2014.6946196
Filename :
6946196
Link To Document :
بازگشت