Abstract :
IN AN expanding industrial plant, it frequently becomes necessary to increase the transformer capacity at a substation to care for heavier power demands at some particular location. An increase in the power capacity of the substation in turn increases the potential short-circuit kilovolt-amperage that might be applied to the substation bus. An increase in the capacity of the primary system furnishing power to the substation transformer also can increase the potential short-circuit kilovolt-amperage available on the secondary bus.
Keywords :
Circuit faults; Current transformers; Fault currents; Inductors; Oil insulation; Rivers; Substations;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1949.6432504
Filename :
6432504
Link To Document :
بازگشت