• DocumentCode
    1424394
  • Title

    Closure to “Scheduling of spinning reserve considering customer choice on reliability”

  • Author

    Jaefari-Nokandi, Meysam ; Monsef, Hasan

  • Author_Institution
    Sch. of Electr. & Comput. Eng., Univ. of Tehran, Tehran, Iran
  • Volume
    26
  • Issue
    2
  • fYear
    2011
  • fDate
    5/1/2011 12:00:00 AM
  • Firstpage
    968
  • Lastpage
    968
  • Abstract
    In the paper, it is shown that according to the selected load shedding strategy, all individual reliability constraints corresponding to customers can be integrated into a single reliability constraint corresponding to the system ELNS. If the system reliability constraint is satisfied, then all individual consumers´ reliability constraint would be satisfied, too. Therefore, the ISO should set spinning reserve based on the system ELNS.
  • Keywords
    ISO standards; load shedding; power distribution reliability; scheduling; ELNS; ISO; consumer reliability constraint; customer choice; load shedding; reliability constraints; scheduling; spinning reserve; Economics; ISO; Power system reliability; Reliability; Spinning; Stochastic processes; Strontium;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2010.2093056
  • Filename
    5686900