DocumentCode :
143078
Title :
Sentinel-1A LEOP and commissioning
Author :
Torres, Ramon ; Lokas, Svein ; Geudtner, Dirk ; Rosich, Betlem
Author_Institution :
ESTEC, Eur. Space Agency, Noordwijk, Netherlands
fYear :
2014
fDate :
13-18 July 2014
Firstpage :
1469
Lastpage :
1472
Abstract :
Sentinel-1A, the first component of the Copernicus Space Segment developed by the European Space Agency, has been launched 3 April 2014. The LEOP Phase is expected to last three days where all subsystems and the SAR instrument will be checked. It is immediately followed by the three-month Commissioning Phase that will include the in-orbit Calibration and Characterisation, and the verification of the satellite, in order to deliver a full functional and well performing satellite to the mission operations. This paper will present the LEOP and Commissioning activities in progress, and the status of Calibration, Characterisation and Verification activities of the Commissioning in place.
Keywords :
calibration; geophysical equipment; geophysical techniques; remote sensing; AD 2014 04 03; Copernicus Space Segment; European Space Agency; LEOP phase; Launch and Early Operations Phase; SAR instrument; SENTINEL-1A; calibration activity status; characterisation activity status; in-orbit calibration; in-orbit characterisation; three-month commissioning phase; verification activity status; Calibration; Instruments; Orbits; Payloads; Satellites; Space vehicles; Synthetic aperture radar;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Geoscience and Remote Sensing Symposium (IGARSS), 2014 IEEE International
Conference_Location :
Quebec City, QC
Type :
conf
DOI :
10.1109/IGARSS.2014.6946714
Filename :
6946714