DocumentCode :
1431541
Title :
Production testing of large D-C apparatus
Author :
Baldwin, M. J. ; Barnhart, H. D.
Author_Institution :
General Electric Company Erie, Pa.
Volume :
69
Issue :
5
fYear :
1950
fDate :
5/1/1950 12:00:00 AM
Firstpage :
458
Lastpage :
458
Abstract :
ACCURATE ELECTRICAL TESTING for maintenance of quality control of d-c machines is highly desirable. To achieve this with the conventional load-run test methods necessitates that a good brush fit on the commutator be first established. Such fitting involves brush sanding, seating, and running under load until stability is obtained. This is a time-consuming and expensive process. The test here described offers a practical means of controlling the quality of the product in repetitive production. However, it neither obviates the necessity of load-testing in development work, nor of periodic load-testing as a check on quality in general production.
Keywords :
Bridge circuits; Brushes; Commutation; Frequency modulation; Oscilloscopes; Production; Testing;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1950.6433864
Filename :
6433864
Link To Document :
بازگشت