Title :
Civil-engineering works for a.c. electrification. Developments since 1960
Author_Institution :
British Railways, Chief Civil Engineer´´s Department, London Midland Region, London, UK
fDate :
1/1/1972 12:00:00 AM
Abstract :
An account is given of the change in conditions on British Railways during the period 1960¿1970 which have required developments in methods of achieving clearances for a.c. electrification. Relatively lightweight precast reinforced-concrete arch units have been developed for erection by off-track equipment to replace many existing arch bridges. Different techniques for individual bridges are also described. Experience in running has indicated that waterproofing is a very important factor, and this, together with parapet treatments, is reviewed.
Keywords :
civil engineering; railways; 1960 to 1970 modernization; AC electrification; British Railways; civil engineering; lightweight precast reinforced concrete arch units; parapet treatments; railways; waterproofing;
Journal_Title :
Electrical Engineers, Proceedings of the Institution of
DOI :
10.1049/piee.1972.0010