DocumentCode :
1432628
Title :
High-voltage rectifier equipment for tube testing
Author :
Durand, S. R.
Author_Institution :
Allis-Chalmers Manufacturing Company, San Francisco. Calif.
Volume :
69
Issue :
9
fYear :
1950
Firstpage :
781
Lastpage :
781
Abstract :
MERCURY-ARC rectifier equipment of high capacity and voltage rating and special design for tube-testing service has been installed in the RCA-Victor Company Advanced Development Laboratory at Lancaster, Pa. The equipment provides 2,000 kw at 12,000 volts d-c with two rectifier units connected in parallel, and 2,000 wk at 24,000 volts d-c with the two units in series. In each case, the d-c windings of the rectifier transformers are displaced 30 electrical degrees so as to achieve, effectively, 12-phase rectification. The basic power circuit of the installation is shown in Figure 1.
Keywords :
Circuit breakers; Electron tubes; Rectifiers; Regulators; Testing; Voltage control; Windings;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1950.6434048
Filename :
6434048
Link To Document :
بازگشت