Title :
Sudden load reduction in a steam power plant
Author_Institution :
Consolidated Edison Company of New York, Inc., New York, N. Y.
Abstract :
WITH a generating capacity considerably in excess of its local busload, the Sherman Creek generating station of the New York Consolidated Edison Company has to depend on one high-capacity tie to connect it with the rest of the system. Use of the major portion of the plant´s capacity, therefore, depends on this tie feeder to transmit all of the plant´s output that is not needed for the local bus load. At certain times the plant generates ten times the local load.
Keywords :
Boilers; Generators; Ignition; Turbines; Turbogenerators; Valves; Voltage control;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1950.6434132