    Modeling the EPRI-Wisconsin Power and Light Broken Wire Tests

  • Author

    Peabody, Alan B. ; McClure, Ghyslaine

  • Author_Institution
    Constr. Manage. Program, Univ. of Alaska Anchorage, Anchorage, AK, USA
  • Volume
    25
  • Issue
    3
  • fYear
    2010
  • fDate
    7/1/2010 12:00:00 AM
  • Firstpage
    1826
  • Lastpage
    1833
  • Abstract
    In the late 1970s, the Electric Power Research Institute and Wisconsin Power and Light performed a series of tests to measure the forces on a power transmission tower due to broken conductors. Three of those tests have been modeled using ADINA, a finite-element structural analysis program with the ability to perform nonlinear time history analyses of dynamic events. When a wire breaks, the time history of the force on the tower typically has two peaks. The first peaks were modeled accurately in time and magnitude. The second peaks were modeled accurately in time; however, the magnitudes were larger than those measured during the tests. The simulated time histories contained high frequencies due to the discretization of the real structure into the finite elements. Numerical filtering was used to remove these modeling artifacts.
  • Keywords
    cable testing; finite element analysis; poles and towers; power transmission lines; ADINA model; EPRI-Wisconsin Power and Light; broken conductors; broken wire tests; finite-element structural analysis program; power transmission tower; Conductors; finite-element methods; modeling; power transmission lines; power transmission mechanical factors; power transmission testing;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/TPWRD.2010.2041559
  • Filename
    5427016