Installation and Power Grid Demonstration of a 22.9 kV, 50 MVA, High Temperature Superconducting Cable for KEPCO
Author :
Song-Ho Sohn ; Hyung-Suk Yang ; Ji-Hyun Lim ; Seung-Ryle Oh ; Seong-Woo Yim ; Su-Kil Lee ; Hyun-Man Jang ; Si-Dole Hwang
Author_Institution :
KEPCO Res. Inst., Daejeon, South Korea
Volume :
22
Issue :
3
fYear :
2012
fDate :
6/1/2012 12:00:00 AM
Firstpage :
5800804
Lastpage :
5800804
Abstract :
Korea Electric Power Corporation (KEPCO) has a great interest on the application of HTS cable to its network to relieve power congestion and enhance the reliability of the power system. Down through the years from 2005 to 2010, the 22.9 kV, 50 MVA HTS cable has been demonstrated by field test, showing affirmative results. With the financial support of Ministry of Knowledge and Economy (MKE), the new project to install and operate the HTS cable in electrical network of Korea was launched in 2008. An HTS cable with the 22.9 kV, 50 MVA, and 410 m length was installed in the KECPO grid in the end of 2010. After the integration of the HTS cable system, the commissioning items of the DC withstand voltage test, DC critical current test, and heat loss measurements were conducted in accordance with the Korean industrial standard, and self-defined specifications. The HTS cable was energized on the 154 kV Icheon substation of KEPCO on August 19th, 2011. The details of the project description, onsite installation, and commissioning tests are presented in this paper.
Keywords :
commissioning; critical currents; electrical installation; heat losses; high-temperature superconductors; power cables; power grids; power transmission economics; power transmission reliability; substations; superconducting cables; DC critical current testing; DC withstand voltage testing; HTS cable; Icheon substation; KEPCO; Korea Electric Power Corporation; Korean industrial standard; MKE; Ministry of Knowledge and Economy; apparent power 50 MVA; commissioning testing; electrical network; field testing; heat loss measurement; high temperature superconducting cable; onsite installation; power congestion; power grid demonstration; power system reliability enhancement; project description; self-defined specification; size 410 m; voltage 154 kV; voltage 22.9 kV; Cable shielding; Cryogenics; High temperature superconductors; Power cable insulation; Power cables; Superconducting cables; Commissioning test; cryogenic refrigeration system; real grid operation; superconducting cable;
fLanguage :
English
Journal_Title :
Applied Superconductivity, IEEE Transactions on
Publisher :
ieee
ISSN :
1051-8223
Type :
jour
DOI :
10.1109/TASC.2011.2180279
Filename :
6142149
Link To Document :
بازگشت