• DocumentCode
    14372
  • Title

    Track records

  • Author

    Andrews, C.

  • Volume
    8
  • Issue
    11
  • fYear
    2013
  • fDate
    Dec-13
  • Firstpage
    72
  • Lastpage
    74
  • Abstract
    To run trains to Abbey Wood, Crossrail is building a 2.6km tunnel under the Thames between Plumstead and North Woolwich. This tunnel will sit off the main line that goes from Maidenhead in Berkshire and Heathrow Airport through central London, via Paddington and Liverpool Street, along the edge of the medieval and Roman cities, and finally out to Romford and Sheffield in Essex. The paper discusses that the new railway line for Greater London - is more than picking a route and laying track. As Crossrail archaeologists uncover bison bones - and Black Death.
  • Keywords
    diseases; railway industry; tunnels; Black Death epidemic; Crossrail; Greater London; bison bones; railway industry; railway line; tunnel;
  • fLanguage
    English
  • Journal_Title
    Engineering & Technology
  • Publisher
    iet
  • ISSN
    1750-9637
  • Type

    jour

  • DOI
    10.1049/et.2013.1110
  • Filename
    6679097