Kilowatts, kilovars, and system investments
Author :
Butler, J. W.
Author_Institution :
General Electric Company, Schenectady, N. Y.
Volume :
62
Issue :
3
fYear :
1943
fDate :
3/1/1943 12:00:00 AM
Firstpage :
133
Lastpage :
137
Abstract :
WHAT portion of the total system investment can one equitably allocate to the system kilovar requirements? Or, looking at it in a little different way, what portion of the system kilowatt capacity is used by kilovars ? The answer to these questions obviously depends upon the method of supplying the kilovars. It is indicated in this analysis that supplying the kilovar requirements of a system in general may be divorced from supplying the kilowatt requirements and that the two factors may be dealt with as independent commodities. This approach shows that maximum usage of system capacity is made in producing kilowatts.
Keywords :
Capacitors; Companies; Generators; Investments; Limiting; Reactive power; System analysis and design;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1943.6435653
Filename :
6435653
Link To Document :
بازگشت