Abstract :
THE Institute at present is fostering a program encouraging discussion of means of obtaining greater loading out of existing equipment. As part of this program the general systems subcommittee of the power transmission and distribution committee has undertaken the task of analyzing what can be done with generators of reactive power in reducing the kilovolt-ampere demand upon system elements, thereby releasing more of the system capacity for useful kilowatt loading.