• DocumentCode
    1443600
  • Title

    AT&T´s new approach to the synchronization of telecommunication networks

  • Author

    Abate, John E. ; Butterline, Edgar W. ; Carley, Roy A. ; Greendyk, Paul ; Montenegro, Adolfo M. ; Near, Christopher D. ; Richman, Steven H. ; Zampetti, George P.

  • Author_Institution
    AT&T Bell Lab., Holmdel, NJ, USA
  • Volume
    27
  • Issue
    4
  • fYear
    1989
  • fDate
    4/1/1989 12:00:00 AM
  • Firstpage
    35
  • Lastpage
    45
  • Abstract
    A description is given of AT&T´s nationwide synchronization network along with a tutorial on the importance of and need of synchronization. The primary reference clock (PRC) is described along with its verification methodology, capabilities, and performance. The clock and transmission models are discussed along with methods of specifying and testing clock performance. Planning tools and methodology for the synchronization of private digital networks are presented. An expert system that uses the clock models to prepare the optimum performance synchronization plan for a private network is introduced.<>
  • Keywords
    clocks; digital communication systems; expert systems; synchronisation; telecommunication networks; AT&T; clock models; clock performance testing; clock verification; expert system; nationwide synchronization network; planning methodology; planning tools; primary reference clock; private digital networks; telecommunication networks; transmission models; Clocks; Life estimation; Meeting planning; Monitoring; Partial response channels; Robustness; Synchronization; System testing; Telephony; Timing;
  • fLanguage
    English
  • Journal_Title
    Communications Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    0163-6804
  • Type

    jour

  • DOI
    10.1109/35.90471
  • Filename
    90471