DocumentCode :
1447651
Title :
Relative expense for service restoration with different types of overcurrent protection for distribution circuits
Author :
Lincks, G. F. ; Craig, C. R.
Author_Institution :
General Electric Company in Pittsfield, Mass.
Volume :
61
Issue :
11
fYear :
1942
Firstpage :
813
Lastpage :
820
Abstract :
THE combination of line sectionalizing in the main feeder, individual protection at branch-line junctions, and re-closing relays and breakers at the substation has been shown to provide a cumulative reduction in consumer minutes outage (minutes of outage per consumer per year) that no one of the methods can provide alone.1 Branch protection proved to be of greater value than line sectionalizing.
Keywords :
Automotive engineering; Circuit breakers; Circuit faults; Fuses; Laboratories; Maintenance engineering; Substations;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1942.6436611
Filename :
6436611
Link To Document :
بازگشت