• DocumentCode
    1447651
  • Title

    Relative expense for service restoration with different types of overcurrent protection for distribution circuits

  • Author

    Lincks, G. F. ; Craig, C. R.

  • Author_Institution
    General Electric Company in Pittsfield, Mass.
  • Volume
    61
  • Issue
    11
  • fYear
    1942
  • Firstpage
    813
  • Lastpage
    820
  • Abstract
    THE combination of line sectionalizing in the main feeder, individual protection at branch-line junctions, and re-closing relays and breakers at the substation has been shown to provide a cumulative reduction in consumer minutes outage (minutes of outage per consumer per year) that no one of the methods can provide alone.1 Branch protection proved to be of greater value than line sectionalizing.
  • Keywords
    Automotive engineering; Circuit breakers; Circuit faults; Fuses; Laboratories; Maintenance engineering; Substations;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1942.6436611
  • Filename
    6436611