• DocumentCode
    1449865
  • Title

    First supercharged generator installed at wisconsin power and light company

  • Volume
    70
  • Issue
    11
  • fYear
    1951
  • Firstpage
    1025
  • Lastpage
    1029
  • Abstract
    The installation of the first supercharged generator at the Edgewater plant of the Wisconsin Power and Light Company in Sheboygan, Wis., has been announced by the Allis-Chalmers Manufacturing Company, Milwaukee, Wis. This new design 60,000-kw 12,500-volt 3,600-rpm steam turbine driven generator was installed in midsummer and is now in operation. It embodies a new principle which saves 30 to 40 per cent of the material of a normal 60,000-kw machine.
  • Keywords
    Companies; Generators; Glass; Metals; Plastics; Receivers; TV;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1951.6436949
  • Filename
    6436949