Abstract :
IN CONNECTION WITH the installation of Potomac River generating station C, it was necessary to develop preliminary plans for transmission of the energy generated in the new plant to the load. The plans selected have certain features which are not commonplace, such as comparatively small capacity of individual transmission lines, use of phase angle control, and the absence of high-voltage circuit breakers except at the generating station.