DocumentCode
1456302
Title
Electronic elevator supervisor in new building fills heavy traffic demands
Volume
71
Issue
3
fYear
1952
fDate
3/1/1952 12:00:00 AM
Firstpage
299
Lastpage
300
Abstract
Elevators so controlled electronically that greater service is available to meet heavy traffic demands have been installed in the new 32-story, air-conditioned Chrysler Building East, New York City, N. Y., which wasopened in November 1951.
Keywords
Electric potential; Electron tubes; Elevators; Materials; NIST; Springs;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1952.6438034
Filename
6438034
Link To Document