• DocumentCode
    1456857
  • Title

    Generator winding design-Amos 3 with 25 years experience

  • Author

    Oliver, Jim ; Michalec, Jim ; Zimmerli, Beat ; Joho, R. ; Krick, N. ; Huber, A.

  • Volume
    16
  • Issue
    1
  • fYear
    2001
  • fDate
    3/1/2001 12:00:00 AM
  • Firstpage
    87
  • Lastpage
    91
  • Abstract
    Over 25 years ago, American Electric Power (AEP) purchased for the John E. Amos Plant Unit 3, the first of six new 1300 MW units. With a highly coordinated effort utilizing AEPs operating experience and the manufacturer´s design and manufacturing capability, extraordinarily reliable generators were produced which have run for all these years with very little trouble. This paper shows the advantages to be achieved by careful consideration of all aspects of stator winding design in large powerful turbine generators: conductors, wedging, and end winding support
  • Keywords
    reliability; stators; turbogenerators; 1300 MW; 25 y; American Electric Power; John E. Amos Plant Unit 3; conductors; end winding support; generator winding design; operating experience; reliability; stator winding design; turbine generator; wedging; Conductors; Cooling; Copper; Manufacturing; Power generation; Solids; Stator cores; Stator windings; Steel; Turbines;
  • fLanguage
    English
  • Journal_Title
    Energy Conversion, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8969
  • Type

    jour

  • DOI
    10.1109/60.911409
  • Filename
    911409