• DocumentCode
    1457871
  • Title

    Actions Before... and After a Flood

  • Author

    Abi-Samra, Nicholas ; Henry, Wayne

  • Volume
    9
  • Issue
    2
  • fYear
    2011
  • Firstpage
    52
  • Lastpage
    58
  • Abstract
    After a flood, large amounts of water and mud can remain trapped in substation equipment, making the repair of such equipment a sizable task and lengthening the restoration task. Certain preventive measures and preparatory steps can help diminish such impacts and reduce restoration times. Extreme weather impacts, such as those from floods, need to be understood, and steps need to be taken to adjust system design, asset management, and operating practices. To effectively achieve such objectives, lessons learned from some utilities that have recovered from floods can be invaluable. The best advice is to plan ahead for the risk of flooding and do not wait until the last minute to put such plans and measures into action.
  • Keywords
    floods; planning; substations; flood; mud; restoration times; substation equipment; water; Disaster management; Floods; Meteorology; Mobile communication; Rivers; Substations;
  • fLanguage
    English
  • Journal_Title
    Power and Energy Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1540-7977
  • Type

    jour

  • DOI
    10.1109/MPE.2010.939950
  • Filename
    5719455