DocumentCode
1459141
Title
Automatic phase angle and voltage control
Author
Derr, W. A. ; Travers, F. H. ; Jolly, R. M.
Author_Institution
Westinghouse Electric Corporation. East Pittsburgh, Pa.
Volume
72
Issue
2
fYear
1953
Firstpage
164
Lastpage
164
Abstract
IN THE MARCUS HOOK AREA, a few miles south of Chester, Pa., the Philadelphia Electric Company supplies a large concentration of industrial load, requiring a high degree of service continuity. Heretofore this load has been supplied directly from the Chester Generating Stations by means of 13.8-kv 3-phase underground cable lines. To provide reliable service, many of the customers in this area have been provided with dual service lines, and in most instances the two lines have been operated in parallel.
Keywords
Circuit breakers; Regulators; Reliability; Resistance; Substations; Voltage control; Wires;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1953.6438504
Filename
6438504
Link To Document