DocumentCode
145985
Title
A novel protection scheme for two-phase faults in power distribution system with neutral ungrounded
Author
Shengxing Shi ; Aoyu Lei ; Xin Li ; Xinzhou Dong
Author_Institution
Dept. of Electr. Eng., Tsinghua Univ., Beijing, China
fYear
2014
fDate
March 31 2014-April 3 2014
Firstpage
1
Lastpage
4
Abstract
A novel protection scheme for two-phase faults in power distribution system with neutral ungrounded is presented. The feasibility of tripping single-phase circuit when a phase-to-phase or two-phase-to-ground fault occurs is studied with induction motor loads as the focus. The paper at first analyses the effect of a induction motor runs with one phase cut off theoretically. And then a real power distribution system model with 110kV, 35kV and 6kV voltage levels is built in PSCAD/EMTDC. Three feasibility criteria are proposed for motors in continuous operation with single-phase opened. At last, the novel protection scheme is testified in simulation with protection time and reclosing time as variables respectively. The results verify that the scheme is feasible and power supply reliability is improved.
Keywords
induction motors; power distribution faults; power distribution protection; power distribution reliability; PSCAD-EMTDC; feasibility criteria; induction motor loads; neutral ungrounded; phase-to-phase fault; power distribution system; power supply reliability; protection scheme; protection time; reclosing time; two-phase-to-ground fault; voltage 110 kV; voltage 35 kV; voltage 6 kV; open-phase operation; phase-to-phase fault; power distribution system; two-phase-to-ground fault;
fLanguage
English
Publisher
iet
Conference_Titel
Developments in Power System Protection (DPSP 2014), 12th IET International Conference on
Conference_Location
Copenhagen
Print_ISBN
978-1-84919-834-9
Type
conf
DOI
10.1049/cp.2014.0051
Filename
6822859
Link To Document