Abstract :
AT THE technical session on Systems Engineering of the AIEE Winter General Meeting in February 1949, the general problem of operating steam power plants was thoroughly reviewed. Three phases of operation were discussed as follows: 1. The general problem of fluctuating loads on power systems.1 2. Operation of steam turbines on fluctuating loads.2 3. Design of boilers and boiler control for fluctuating loads.3
Keywords :
Boilers; Centralized control; Controllability; Furnaces; Turbines;