DocumentCode :
1460509
Title :
Setting and testing automatic generator synchronizers
Author :
Grono, Andrzej J. ; Wlodarski, Jan P.
Author_Institution :
Tech. Univ. Gdansk, Poland
Volume :
12
Issue :
1
fYear :
1999
fDate :
1/1/1999 12:00:00 AM
Firstpage :
38
Lastpage :
40
Abstract :
In today´s electric power systems, generation relies almost exclusively on many AC generating units operating in parallel. When a new generating unit is being connected to the system, a variety of conditions must be precisely satisfied, including the amplitude, frequency, and phase conditions. This article describes a new method for establishing the advance time, which is the most important parameter of an automatic generator synchronizer, and focuses on computer simulations used to test the results
Keywords :
AC generators; machine control; machine testing; synchronisation; AC generating units; advance time establishment; amplitude conditions; automatic generator synchronizer; frequency conditions; phase conditions; power systems; setting; testing; Automatic testing; Circuit breakers; Circuit simulation; Circuit testing; Frequency synchronization; Power system dynamics; Power system reliability; Switching circuits; Time measurement; Voltage;
fLanguage :
English
Journal_Title :
Computer Applications in Power, IEEE
Publisher :
ieee
ISSN :
0895-0156
Type :
jour
DOI :
10.1109/67.738317
Filename :
738317
Link To Document :
بازگشت