DocumentCode
1461424
Title
Impact of the atomic energy program on the electrical industry
Author
Thaxton, G. W.
Author_Institution
Electric Power Branch, Division of Construction and Supply, U. S. Atomic Energy Commission, Washington, D. C.
Volume
73
Issue
7
fYear
1954
fDate
7/1/1954 12:00:00 AM
Firstpage
592
Lastpage
596
Abstract
Starting with a power requirement of 225 megawatts at Oak Ridge during the war, the Atomic Energy Commission´s demands on the suppliers of power will be approximately 6,500 megawatts. How the problems raised by these unprecedented demands are being solved is a tribute to American engineering talents.
Keywords
Companies; Contracts; Electrical engineering; Fuels; Investments; Power supplies;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1954.6438861
Filename
6438861
Link To Document