DocumentCode
1461524
Title
Taking environmental constraints into account in the planning of the extra high voltage transmission network; EDF´s approach
Author
Trogneux, F. ; Doquet, M. ; Mallet, P.
Author_Institution
Power Syst. Dept., EDF-DER, Clamart, France
Volume
11
Issue
4
fYear
1996
fDate
10/1/1996 12:00:00 AM
Firstpage
1901
Lastpage
1906
Abstract
As EDF is experiencing increasing difficulties in developing its transmission network, the time may have come to reconsider the projects selection method. In this paper, the authors point out that the currently used method essentially relies on a classical discounted balance criterion. They then present a new method which takes into account the impact of a project on the environment, by considering an environmental risk which may jeopardize the project´s success. This method helps to evaluate the probability that each possible route of each project will be carried through. A simple probability computation then allows the derivation of a global comparison of the eligible projects on the basis of an expected discounted balance criterion. Experiments now in progress will help to decide upon this method´s efficiency in the context of its operational use
Keywords
electricity supply industry; environmental factors; power system planning; power transmission; probability; project engineering; transmission network calculations; transmission networks; EDF; EHV transmission network planning; France; environmental constraints; environmental risk; expected discounted balance criterion; probability computation; projects selection method; Context; Costs; Decision making; Density estimation robust algorithm; Intelligent networks; Power system interconnection; Power system planning; Power transmission lines; Rail transportation; Voltage;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/61.544274
Filename
544274