DocumentCode
1464824
Title
Incremental cost of power delivered computer
Author
Early, E. D. ; Phillips, W. E. ; Shreve, W. T.
Author_Institution
Southern Services, Inc., Birmingham, Ala.
Volume
74
Issue
6
fYear
1955
fDate
6/1/1955 12:00:00 AM
Firstpage
481
Lastpage
481
Abstract
THE integrated Southern Company System, consisting of Alabama Power Company, Georgia Power Company, Gulf Power Company, and Mississippi Power Company, has had in operation an “incremental cost of power delivered” computer since June 1954. This analogue type of computer quickly determines the incremental percentage of power delivered from each source, as selected, and simultaneously calculates the incremental cost of power delivered from any particular generator.
Keywords
Companies; Computers; Generators; Indexes; Loading; Power systems; Propagation losses;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1955.6439410
Filename
6439410
Link To Document