Title :
Power system: Arnold engineering development center
Author_Institution :
Aro, Inc., Tullahoma, Tenn.
Abstract :
The electric distribution system described began operation in October 1952. As designed and built, it has given every indication of its ability to fulfill its requirements and also of being capable of modification as conditions change.
Keywords :
Buildings; Cable TV; Power cables; Power control; Substations; Test facilities;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1955.6439545