Abstract :
IN THE PLANNING of the Pittsburgh downtown 69-kv power supply, several factors had to be considered in the design of switchgear equipment: The substation area was limited, the high-voltage circuits were subject to lightning exposure, appearance requirements were dictated by a downtown area development, and safety was important.