Abstract :
The primary purpose of this paper is to stimulate thinking about how the existing transmission system flexibility can be used. New electronic controller applications, based on thyristor technology, have helped to focus on the inherent flexibility in existing transmission systems. However, over the years, many techniques have been applied to take advantage of existing transmission system flexibility. This discussion provides examples of how system operation and reliability can be enhanced, with conventional equipment, by taking advantage of existing transmission system flexibility
Keywords :
power system control; power system planning; power system reliability; thyristor applications; automatic generation run-back; automatic generation tripping; circuit breaker overloads; electronic controller applications; network configuration change; power system planning; substation overloads; system operation enhancement; system reliability enhancement; thyristor technology; transmission system flexibility; Automatic control; Cables; Circuits; Control systems; Protection; Senior members; Stability; Thyristors; Transformers; Voltage control;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.544657
Filename :
544657
Link To Document :
بازگشت