• DocumentCode
    1470358
  • Title

    Transmission and relaying problems on the fort peck project

  • Volume
    63
  • Issue
    6
  • fYear
    1944
  • fDate
    6/1/1944 12:00:00 AM
  • Firstpage
    466
  • Lastpage
    467
  • Abstract
    A. R. van C. Warrington (General Electric Company, Philadelphia, Pa.): I should like to congratulate the authors on their interesting paper describing the adaptation of the constant mho circle to the balanced beam type of relay, which I understand was applied at Fort Peck last summer.
  • Keywords
    Circuit faults; Circuit stability; Generators; Impedance; Inductors; Relays; Shunts (electrical);
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1944.6440351
  • Filename
    6440351